Earth filling work by manual labour with specified soil in any type of embankment and bridge approaches including cutting, carrying, filling etc. |
Sand filling on the prepared foundation bed with sand of specified FM in layers not more than 150 mm thick including etc |
Single layer brick flat soling with 1st class or picked kiln burnt bricks in foundation etc |
PCC-10 plain cement concrete work in foundation with minimum compressive strength etc |
Brick work 1st class brick in specified cement mortar in foundation with sand of minimum FM 1.20 and cement etc |
Eart Work in excavation of foundation trenches including layout, by excavating earth to the lines etc |
Minimum 12mm thick cement plaster (1:4) with Portland composite cement etc. |
Earth filling work by manual labour with specified soil in any type of embankment and bridge approaches including cutting, carrying, filling etc. |
Sand filling on the prepared foundation bed with sand of specified FM in layers not more than 150 mm thick including etc |
Single layer brick flat soling with 1st class or picked kiln burnt bricks in foundation etc |
PCC-10 plain cement concrete work in foundation with minimum compressive strength etc |
Brick work 1st class brick in specified cement mortar in foundation with sand of minimum FM 1.20 and cement etc |
Eart Work in excavation of foundation trenches including layout, by excavating earth to the lines etc |
Minimum 12mm thick cement plaster (1:4) with Portland composite cement etc. |
Earth filling work by manual labour with specified soil in any type of embankment and bridge approaches including cutting, carrying, filling etc. |
Sand filling on the prepared foundation bed with sand of specified FM in layers not more than 150 mm thick including etc |
Single layer brick flat soling with 1st class or picked kiln burnt bricks in foundation etc |
PCC-10 plain cement concrete work in foundation with minimum compressive strength etc |